SC-IGC "Task Not Completed" Eastern Alps?
SC-IGC "Task Not Completed" Eastern Alps?
I flew the Soaring On Heaven Standard task last night, on Eastern Alps. Finished the race, got scored, but when I export the ftr to igc, and open it in ShowCondorIGC, it says "Task not completed". If you look at the height trace at the bottom, sure enough, it looks like I landed before reaching the finish.
Is this due to the oft-mentioned map calibration error in Eastern Alps? Or something else?
Is this due to the oft-mentioned map calibration error in Eastern Alps? Or something else?
You do not have the required permissions to view the files attached to this post.
Re: SC-IGC "Task Not Completed" Eastern Alps?
I use ShowCondorIGC 2.6 and there are no "Task not completed" message.
Fox9
Fox9
Re: SC-IGC "Task Not Completed" Eastern Alps?
Hmmm, mine is 2.5, and I get this:
Maybe should upgrade?
See also, summary is 0Maybe should upgrade?
You do not have the required permissions to view the files attached to this post.
Re: SC-IGC "Task Not Completed" Eastern Alps?
sure, try 2.6 => http://dl.virtualsoaring.eu/SCI260.zipBulau wrote:See also, summary is 0
Maybe should upgrade?
- Andrzej Czop
- Posts: 457
- Joined: Mon Aug 24, 2009 1:08 pm
Re: SC-IGC "Task Not Completed" Eastern Alps?
I had the same problem:3P wrote:sure, try 2.6 => http://dl.virtualsoaring.eu/SCI260.zipBulau wrote:See also, summary is 0
Maybe should upgrade?
http://forum.condorsoaring.com/viewtopi ... GC#p117690
Re: SC-IGC "Task Not Completed" Eastern Alps?
Yes, I upgraded to 2.6, and still get same error. It would only be a problem on a task where you are required to score by IGC.
Re: SC-IGC "Task Not Completed" Eastern Alps?
Is it IGC from Condor or from CC?
Re: SC-IGC "Task Not Completed" Eastern Alps?
Very strange. I can see, that SCI regognized the TPs (vertical dotted lines).
The start time in your FlightDat windows is 14:43:59 after your finish time.
Probably this caused the error message.
In my program the start time is 13:20:46 and everything is OK (see picture).
Has anybody else this strange bug? I must reproduce it on my computer
to repair it.
Fox9
The start time in your FlightDat windows is 14:43:59 after your finish time.
Probably this caused the error message.
In my program the start time is 13:20:46 and everything is OK (see picture).
Has anybody else this strange bug? I must reproduce it on my computer
to repair it.
Fox9
You do not have the required permissions to view the files attached to this post.
Re: SC-IGC "Task Not Completed" Eastern Alps?
Ah, yes, I didn't notice that...14:43 is more like the finish time. For me, SCIGC is not recognizing the start, and also not the first TP.
You do not have the required permissions to view the files attached to this post.
Re: SC-IGC "Task Not Completed" Eastern Alps?
In the attachment is SCI 2.6 which I use. There are some light changes.
Unzip the file and replace ShowCondorIGC.exe in the Condor folder
with this file. Let me know, if you get the error message again.
Fox9
Unzip the file and replace ShowCondorIGC.exe in the Condor folder
with this file. Let me know, if you get the error message again.
Fox9
You do not have the required permissions to view the files attached to this post.
Re: SC-IGC "Task Not Completed" Eastern Alps?
OK, now it's good! No more "Task not completed" error!
What was the fix?
What was the fix?
Re: SC-IGC "Task Not Completed" Eastern Alps?
I don't know. If I see something that can be improved, I do it in my personal
version. One of these improvements must fix the problem.
Fox9
version. One of these improvements must fix the problem.
Fox9